Solar PV Interconnection & Battery Storage
Electrical work for solar installations: main service panel integration, battery storage hookups, sub-panel separation, utility coordination with SCE and LADWP.
Common reasons clients call us for solar & battery.
Every situation is different. Here are the typical scenarios we handle in LA County:
- Solar company doesn't do main panel work — needs licensed C-10
- Existing panel needs upgrade before solar interconnect
- Adding battery storage to existing solar system
- Critical loads sub-panel separation for backup power
- NEM 3.0 grid-tied system requires updated metering
- Permit-required electrical work for self-installed solar
Every quote includes these line items.
No surprises, no add-ons hidden in fine print.
Common questions about solar & battery.
Do you install full solar systems?
We focus on the electrical interconnection side. Most clients have a solar company that handles panels and inverters; we handle the panel upgrade, battery hookup, and utility coordination. We can refer trusted solar installers if needed.
Can you connect a battery to an existing solar system?
Yes. We add critical loads sub-panels, transfer switches, and battery hookups to existing PV systems.
How long does interconnection take?
1-3 days depending on scope. Permit and utility approval can add 1-3 weeks before work starts.
Other things we do.
Ready for solar & battery?
Tell us about your project — we'll get back within 24 hours with an itemized written estimate.