⚡ Free 24-hour quotes across LA County · Emergency requests accepted 24/7, subject to crew availability
Licensed C-10 · CSLB #1110475 · 1-Year Workmanship Warranty

EV Charger Installation in Los Angeles

Level 2 charger installation for Tesla, ChargePoint, Wallbox, JuiceBox, and any J1772 charger. Fully permitted, panel-checked, and inspected — usually done in one day.

Starting from$650
Typical range$800–$2,400
Duration4–8 hours
PermitRequired
When you need this

Common reasons clients call us for ev chargers.

Every situation is different. Here are the typical scenarios we handle in LA County:

  • You just bought an EV and standard 120V outlet charges too slowly
  • You want full overnight charge for daily commute
  • Need NEMA 14-50 outlet for portable Tesla Mobile Connector
  • Want hardwired Tesla Wall Connector for fastest home charging
  • Plan to add second EV — need dual charger setup
  • New construction or remodel — pre-wire for future EV
Panel problems
Visual Engineering Showcase

Specialized EV Chargers Infrastructure

Engineered for long-term reliability and code compliance. Every installation is tailored to your architecture with clean, concealed execution.

Tesla Universal Wall Connector Hardwire (48A) Tesla Flagship

Tesla Universal Wall Connector Hardwire (48A)

Up to 44 miles of range per hour of charge. Hardwired directly to a dedicated 60A 240V breaker. Integrated J1772 adapter powers both Tesla and non-Tesla electric vehicles seamlessly.

  • 48A Max Continuous Current
  • Indoor/Outdoor Weatherproof IP55
  • Power Sharing Across Multiple EVs
ChargePoint, Wallbox & Enphase EVSE Installs Universal Level 2

ChargePoint, Wallbox & Enphase EVSE Installs

Custom conduit runs to driveways, carports, and garages. Smart Wi-Fi connectivity for off-peak TOU utility charging schedules that save hundreds per year on Southern California Edison bills.

  • Smart Scheduled Off-Peak Charging
  • Flexible 25-Foot Commercial Cable
  • Energy Star Certified Efficiency
DCC-12 & NeoCharge Smart Load Management (EVEMS) No Panel Upgrade

DCC-12 & NeoCharge Smart Load Management (EVEMS)

Add full 32A–40A Level 2 charging to existing 100A panels without spending $4,000+ on a service upgrade. Smart load monitors automatically pause car charging only when heavy home loads run.

  • Avoid Costly SCE Service Upgrade
  • NEC 625.42 Code-Compliant
  • Plug-and-Play Smart Splitting
Commercial Pedestals & CALGreen Multi-Family Multi-Family & Fleet

Commercial Pedestals & CALGreen Multi-Family

Turnkey installations for apartment buildings, HOAs, retail plazas, and office campuses. Trenching, dual-port bollards, RFID access management, and documentation for incentive applications.

  • Dual-Port Freestanding Pedestals
  • Commercial Revenue & Billing Metering
  • Documentation for Incentive Applications
Scope of Work

What's Included in Every Itemized Quote

Zero surprises, transparent line items, and complete turnkey execution.

01
Panel capacity assessment and load calculation
02
Permit pulled with the city building department
03
40A or 60A dedicated 240V heavy copper branch circuit
04
NEMA 14-50 industrial outlet OR hardwired terminal connection
05
Conduit run (interior EMT or exterior weatherproof Schedule 40)
06
Charger mounted, torqued to specification, and safety tested
07
Wi-Fi configuration for smart charging (Tesla, ChargePoint, Wallbox)
08
City inspection coordination and sign-off
09
1-year workmanship and labor warranty
Execution Workflow

From First Call to Final Sign-Off

Our C-10 licensed process guarantees flawless execution, code compliance, and utility alignment at every stage.

01 Planning

Site Audit & Load Calculation

We inspect existing wiring, calculate continuous electrical loads per NEC 220, determine utility spot feasibility, and deliver an upfront flat-rate proposal.

02 Permitting

Permits & Utility Work Orders

We file architectural line diagrams with LADBS or LA County building departments, submit work orders to LADWP/SCE, and coordinate meter spots.

03 Installation

Turnkey Precision Installation

Certified Journeyman electricians mount enclosures, pull copper conductors, install dual ground rods, bond water mains, and label all branch circuits cleanly.

04 Sign-Off

Inspection & Utility Release

We meet the municipal inspector on-site for sign-off, submit the utility clearance release tag, and activate your modern system with a 1-year warranty.

Our Work

Recent ev chargers projects.

Tesla Wall Connector installation
Exterior ChargePoint installation
NEMA 14-50 EV outlet setup
Free Quote

Ready for ev chargers?

Tell us about your project — we'll get back within 24 hours with an itemized written estimate.

By submitting you agree we may contact you about your quote. We never share your info.

FAQ

Common questions about ev chargers.

Should I get a NEMA 14-50 outlet or a hardwired charger?

Hardwired is recommended for fastest charge (up to 48A continuous on Tesla Wall Connector) and is cleaner-looking. NEMA 14-50 is more flexible if you might move charger or use a portable Tesla Mobile Connector.

Do I need a panel upgrade for an EV charger?

Sometimes. Most homes with a 200A panel can add a 40A EV circuit without issues. Older homes with 100A panels often need a load management device (NeoCharge, DCC-9) or full panel upgrade.

How long does installation take?

Most installs are 4–8 hours. Long conduit runs or panel work in finished walls can extend it to a full day.

Can you install in my detached garage?

Yes. We run a feeder from the main panel through underground conduit (or attic/exterior) to the garage subpanel and EV outlet.

Do you install at apartment buildings?

Yes — we handle multi-unit residential EV installs and work with HOAs/property managers on shared chargers.