⚡ Free 24-hour quotes across LA County · Same-day service available for emergencies
Licensed C-10 · CSLB #1110475

Electrical Panel Upgrades in Los Angeles

Modern homes need modern panels. We replace outdated 100A boxes with 200A or 400A service — fully permitted, inspected, and ready for EVs, solar, and heat pumps.

Starting from$2,800
Typical range$3,500–$6,500
Duration1–2 days
PermitRequired
When you need this

Common reasons clients call us for panel upgrades.

Every situation is different. Here are the typical scenarios we handle in LA County:

  • Your panel is 30+ years old (Federal Pacific, Zinsco, Pushmatic — known fire risks)
  • You're installing an EV charger and need 240V capacity
  • You're going solar — utility requires modern panel for interconnection
  • Lights flicker or breakers trip frequently
  • Insurance company flagged old panel during inspection
  • Adding ADU, heat pump, or major appliance load
What's included

Every quote includes these line items.

No surprises, no add-ons hidden in fine print.

01 Site assessment and load calculation
02 Permit pulled with the city
03 New main panel (Square D, Eaton, or Siemens)
04 New main breaker, bus bars, and breakers
05 Service drop coordination with utility (SCE/LADWP)
06 Grounding system upgrade if needed
07 Inspection coordination and final sign-off
08 1-year workmanship warranty
How it works

From first call to final inspection.

Our process keeps you informed at every step:

1

Free site visit

On-site assessment to verify panel size needed and existing wiring condition.

2

Written estimate

Itemized quote within 24 hours including labor, materials, permits.

3

Permit pulled

We file with your city's Building & Safety. Most jurisdictions: 1-3 days.

4

Utility shutoff

Coordinate brief power shutoff with SCE/LADWP (usually 4-8 hours).

5

Installation

Old panel removed, new panel installed, all circuits properly transferred.

6

Inspection

City inspector signs off. Utility re-energizes the service.

FAQ

Common questions about panel upgrades.

How long is power off during a panel upgrade?

Typically 4–8 hours for a 200A residential upgrade. We schedule with the utility in advance to minimize disruption. For homes with medical needs, we can coordinate generators.

Do you handle the permit?

Yes. We pull the permit in your name (since it's tied to your property), schedule the city inspection, and handle all paperwork. You don't deal with Building & Safety.

Do I need 200A or 400A service?

Most modern single-family homes do well with 200A. If you have a large home (3,500+ sqft), plan multiple EV chargers, electric heat pump, and solar, 400A may be needed. We do a load calculation during the site visit.

What's the cost difference between 200A and 400A?

A 400A service typically runs $2,000–$4,000 more than 200A due to larger meter, conductors, and grounding. We provide both options when 400A is borderline.

Free Quote

Ready for panel upgrades?

Tell us about your project — we'll get back within 24 hours with an itemized written estimate.

By submitting you agree we may contact you about your quote. We never share your info.