⚡ Free 24-hour quotes across LA County · Same-day service available for emergencies
General B + C-10 · No Subcontractors · CALGreen Certified

Commercial EV Charging. One Contractor. Fully Funded.

CALGreen 2026 is law. Your parking lot must comply. KiloWire builds complete EV infrastructure — trenching, conduit, concrete, high-voltage wiring — with one license, one crew, one timeline. Up to $8,500 per port in grant funding available through Communities in Charge.

$8,500
Per port grant
Jan 2026
CALGreen effective
B + C-10
Dual license
0
Subcontractors
CALGreen 2026

The law that applies to your property — effective January 1, 2026.

California Green Building Standards Code now mandates EV charging infrastructure for virtually every commercial and multifamily property undergoing renovation or new construction.

Multifamily (5+ units) Occupancy Withheld

Level 2 Conduit Minimum

Trigger Any parking lot modification
Requirement Every modified stall must be EV-capable (Level 2 conduit minimum)
Commercial (Non-Residential) Permit Denial

10% EVSE-Ready / 2% Equipped

Trigger New construction or major renovation
Requirement 10% of stalls must be EVSE-ready; 2% fully equipped with chargers
HOA & Condo Associations Civil Liability

Level 2 Access for Modified Units

Trigger Any capital improvement to parking lot
Requirement Level 2 access required for all modified parking spaces
Mixed-Use Development Dual Enforcement

Combined Building & Energy Codes

Trigger Residential + commercial renovation
Requirement Both residential and commercial CALGreen standards apply simultaneously

Not sure if your project triggers CALGreen? KiloWire reviews your permit scope at no charge and tells you exactly what's required before you file.

The dual license advantage

Why one contractor doing everything saves you 4–8 weeks and 30% of project cost.

Typical EV Contractor (C-10 only)
Calls a General B subcontractor for asphalt work
Calls another sub for concrete bases
Coordinates 3 separate schedules
Each sub adds margin — cost multiplies
Delays when subs reschedule
Permit requires multiple contractor names
Timeline: 6–10 weeks typical
KiloWire (General B + C-10)
Asphalt cutting — our crew
Trenching & conduit — our crew
Concrete pad pour — our crew
High-voltage wiring & EVSE — our crew
One schedule, one point of contact
One permit with one license number
Timeline: 3–4 weeks typical
Grant funding

Your clients pay for installation. The government reimburses it.

$8,500
per Level 2 port
Communities in Charge

For multifamily properties in qualifying disadvantaged communities. Applications accepted through 2026. KiloWire prepares and submits the grant application as part of the project.

Applications close when funding is exhausted — act before the pool depletes.
$0
utility infrastructure cost
SCE Rule 29

Under SCE's Rule 29 tariff, Southern California Edison designs and installs all electrical infrastructure up to the meter — at no cost to the property owner. KiloWire handles the application and coordinates with SCE's program team.

Available for qualifying commercial properties in SCE territory.

How the Grant Process Works with KiloWire

01

Site Survey

We assess your property, determine CALGreen requirements, and identify grant eligibility.

02

Grant Application

KiloWire prepares and submits Communities in Charge and/or SCE Rule 29 applications.

03

Permit & Construction

One contractor pulls the permit, executes all engineering and building work, and coordinates inspections.

04

Grant Disbursement

Funds are paid directly to KiloWire, reducing your invoice dollar-for-dollar.

Who we serve

Built for property owners and managers who need this done right.

HOAs & Condo Associations

CALGreen compliance, unit-by-unit billing infrastructure, grant applications, and a single permit that covers the entire property.

Apartment Owners

Retrofit existing parking with Level 2 EV access. Communities in Charge funds up to $8,500 per port. We handle the application.

Commercial Developers

Pre-permit CALGreen review, full turnkey EV infrastructure build-out, SCE Rule 29 coordination. One contractor from asphalt to energized charger.

Property Management Companies

Portfolio-level EV infrastructure planning across multiple properties. Volume pricing, coordinated permitting, consistent documentation.

Free site survey

Tell us about your property. We'll identify what CALGreen requires and what grants are available.

No obligation. Written scope and grant eligibility assessment included.

By submitting you agree we may contact you about your quote. We never share your info.