Engineered for Business. Commercial Electrical Infrastructure.
From retail tenant improvements and restaurant build-outs to heavy 480V 3-phase industrial power distribution, KiloWire delivers code-compliant, precision electrical engineering across Greater Los Angeles.
Full-Scope Electrical Services for Facilities & Businesses
We keep your facility safe, energy-efficient, and fully compliant with California Title 24 energy standards and Los Angeles city building codes.
Heavy Power Distribution & Switchgear
Design, installation, and modernization of 120/208V and 277/480V 3-phase systems. Main switchboards, step-down transformers, motor control centers, and panel expansions.
- 400A to 2000A main service switchgear
- Dry-type transformer installation & taps
- Power factor correction & surge protection
Tenant Improvements (TI) & Remodels
Rapid-turnaround electrical fit-outs for retail shops, creative offices, restaurants, medical clinics, and industrial warehouses. We hit your move-in deadline without costly punch-list delays.
- Floor boxes, poke-throughs, and power poles
- Commercial kitchen appliance connections
- Dedicated isolated ground circuits for IT racks
Title 24 Lighting & Automated Controls
Complete compliance with California's stringent Title 24 energy code. We install and commission 0-10V architectural dimming, occupancy sensors, and automated daylight harvesting.
- Daylight harvesting & multi-zone dimming
- Automated demand response (ADR) controllers
- Certified acceptance testing & sign-off packets
Dedicated Machinery Feeds & Drops
Custom power drops for commercial machinery, rooftop HVAC units, walk-in refrigeration compressors, CNC fabrication machinery, and medical diagnostic equipment.
- Rigid & EMT conduit runs with disconnect switches
- Variable frequency drive (VFD) hookups
- Emergency stop circuits & safety interlocks
Commercial EV Charging (CALGreen)
Turnkey Level 2 and DC Fast Charging infrastructure for parking structures, office campuses, and commercial fleets. We handle utility service upgrades and grant incentives.
- CALGreen 2026 multi-stall parking mandates
- Communities in Charge grants (up to $8,500/port)
- EVEMS dynamic load management controllers
City Plan Check & Utility Coordination
Don't let municipal bureaucracy stall your opening date. We coordinate directly with LADBS, Pasadena DWP, Burbank Water & Power, and SCE for swift plan approvals and meter releases.
- Single-line diagram drafting & submittals
- Utility transformer load studies & spot locations
- Clearing stop-work orders & unpermitted work
Heavy-Duty Commercial Power Infrastructure
CSLB C-10 engineered installations built for high operational uptime, Title 24 efficiency, and strict city safety compliance.
3-Phase Distribution 208V / 480V Switchgear & Dry-Type Transformers
Main switchboard installations from 400A to 2000A with high-capacity copper busbars, step-down dry transformers, and utility vault coordination across LADWP & SCE service areas.
Machinery Feeds Dedicated Machinery Feeds & Disconnects
Heavy-duty power runs in rigid and EMT conduit for commercial refrigeration, commercial ovens, CNC machining equipment, and rooftop HVAC units with zero voltage drop.
CALGreen 2026 Workplace & Fleet EV Infrastructure
Turnkey Level 2 dual-port bollards and DC Fast Charging systems for commercial plazas, parking garages, and corporate fleets with dynamic EVEMS load management.
Title 24 Part 6 Title 24 Lighting Automation & Dimming
0-10V architectural dimming, multi-zone daylight harvesting sensors, and automated demand response (ADR) panels passing rigorous city acceptance testing.
Commercial Spaces We Power in Los Angeles
Customized electrical infrastructure built to withstand heavy operational demands.
Retail & Showrooms
High-CRI accent lighting, perimeter track systems, POS checkout power, and illuminated architectural exterior signage.
Restaurants & Hospitality
Dedicated circuits for convection ovens, walk-in coolers, Ansul hood fire-suppression interlocks, and ambient dining controls.
Corporate & Creative Offices
Conference room AV wiring, under-floor cable trays, UPS backup feeds, and low-voltage structured networking.
Warehouses & Logistics
High-bay LED retrofits, forklift charging stations, automated roll-up door wiring, and heavy 480V machine connections.
Commercial Codes &
Energy Strategy
In-depth technical guides covering California energy regulations, SCE rate structures, and EV infrastructure.
CALGreen 2026: Mandatory EV Charging Rules for LA Multifamily Buildings
A comprehensive guide to California's new EV charging infrastructure requirements for apartments, HOAs, and condos with 5+ units. Learn how to comply and access up to $8,500/port in grants.
Read article →HOA Guide: Preparing Your Multifamily Parking Lot for CALGreen 2026
CALGreen 2026 requires EV infrastructure on any permitted parking renovation. Here's the complete breakdown of what's required, what grants are available, and how to get your HOA board to approve the project.
Read article →EV Charger Without a Panel Upgrade? Here's How It's Actually Possible
Most homeowners assume adding an EV charger means upgrading their electrical panel. Most of the time, that assumption costs them $10,000 and four months of waiting. Here's what your electrician probably hasn't told you yet.
Read article →SCE Rate Trends 2026: How to Stop Overpaying on Time-of-Use Plans
SCE rates have risen 83% since 2020 and Time-of-Use plans are getting more aggressive. Here's how battery storage and smart automation let you stop paying peak rates — automatically.
Read article →Tell Us About Your Commercial Project
Provide your facility location and project requirements. Our master electricians provide itemized estimates, plan reviews, and prompt site surveys.