Electrical Panel Upgrade Cost Calculator
Get an accurate, transparent C-10 contractor estimate in 60 seconds. Upload 2 photos of your existing electrical panel for instant engineer clearance and expedited city permitting.
Electrical Panel Upgrade — Fast Quote Calculator
Calculate your turnkey estimate in 60 seconds and submit photos for an expedited SCE/LADWP engineering review.
1. Target Service & Future Loads
Select your desired main electrical capacity and any high-draw electrical equipment you plan to connect.
Standard modern residential standard. Ideal for EV charger, heat pump & modern appliances.
Large estates, dual EV charging, ADUs, full electric conversion, or 4,000+ sq ft homes.
Our engineer will calculate your load based on your square footage and utility history.
Why C-10 Electrical Contractors Require These 3 Photos
In California, electrical panels cannot be quoted blindly over the phone. National Electrical Code (NEC) and local utility standards (SCE Underground & Overhead ESR manual, LADWP Electric Service Requirements) enforce strict legal clearances:
Main Breaker & Bus Rating (Photo 1)
We identify dangerous recalled panel brands (Zinsco, Federal Pacific Electric / Stab-Lok, Challenger) and verify existing service capacity (60A, 100A, or 125A).
Gas Meter Clearance & Working Space (Photo 2)
NEC 110.26 requires a dedicated 30" wide × 36" deep clear workspace in front of the panel. Southern California Gas and utilities mandate a minimum 3-foot horizontal clearance from gas meters.
Overhead Weatherhead & Roof Clearance (Photo 3)
Verifies utility drop height above driveway or walkway, mast roof penetration, and proximity to trees or structures before utility engineering approval.
Gallery of Electrical Horrors
Electricity is no joke. These are real photos of melted breakers, scorched panels, and fire hazards we've encountered on the job. Don't wait until it's too late.
Does your panel look suspicious or smell like burning?
Shut off the main breaker immediately and call our emergency dispatch.
Call (626) 600-0818 NowCommon Questions About Upgrading Your Electrical Panel in LA
How much does a 200 Amp panel upgrade cost in Los Angeles?
A turnkey 200A residential panel upgrade in Los Angeles County typically ranges between $2,800 and $4,500. This includes all city permits, utility coordination with SCE or LADWP, dual 8-foot copper grounding rods, water pipe bonding, whole-home surge protector, and passed inspection guarantee. Relocating a panel or running underground conduit may add $600 to $2,500 depending on trenching distances.
How long will my electricity be shut off during installation?
Electricity is typically shut off for 4 to 6 hours on installation day. We schedule early morning utility disconnects, install the new load center and bonding conductors, pass the city inspector's rough inspection, and have SCE/LADWP restore power the same afternoon.
Why do insurance companies require replacing Zinsco or Federal Pacific panels?
Zinsco and Federal Pacific Electric (FPE) panels have catastrophic failure rates documented by the Consumer Product Safety Commission (CPSC). Their circuit breakers fail to trip during overloads, causing conductors to weld and spark inside walls. Major California homeowners insurance carriers (including State Farm, Travelers, Farmers, and Orion180) routinely deny coverage or cancel policies until these panels are upgraded.
Do you offer financing for electrical panel upgrades?
Yes! We offer flexible financing programs with monthly payments starting from just $79/month upon credit approval. You can upgrade your electrical service now to protect your home and charge your EV without large out-of-pocket costs.