⚡ Free 24-hour quotes across LA County · Same-day service available for emergencies
⚡ CSLB C-10 Licensed #1110475 • SCE & LADWP Turnkey Solutions

Electrical Panel Upgrade Cost Calculator

Get an accurate, transparent C-10 contractor estimate in 60 seconds. Upload 2 photos of your existing electrical panel for instant engineer clearance and expedited city permitting.

Flat-Rate Pricing (No Hidden Fees)
100% City Permitted & SCE / LADWP Coordinated
From $79/mo Flexible Financing
Same-Day Power Restoration
⚡ California C-10 Licensed Contractor #1110475

Electrical Panel Upgrade — Fast Quote Calculator

Calculate your turnkey estimate in 60 seconds and submit photos for an expedited SCE/LADWP engineering review.

1. Target Service & Future Loads

Select your desired main electrical capacity and any high-draw electrical equipment you plan to connect.

200 AmpMost Popular

Standard modern residential standard. Ideal for EV charger, heat pump & modern appliances.

400 AmpHeavy Load

Large estates, dual EV charging, ADUs, full electric conversion, or 4,000+ sq ft homes.

Not SureNeed Advice

Our engineer will calculate your load based on your square footage and utility history.

EV Charger (1 or 2 vehicles)Dedicated 50A/60A Level 2 circuit
Solar Panels (Existing / Planned)225A bus rating to avoid line-side tap
Battery Storage (Tesla Powerwall)Backup gateway & microgrid integration
Heat Pump / Electric HVAC / Mini-splitsHigh inrush breaker & disconnect
All-Electric AppliancesInduction cooktop, Heat pump water heater
Pool / Hot Tub / ADU Sub-panelSub-panel feeder & outdoor conduit
Keep in existing locationFastest & most cost-effective
Relocate to another spotRequires junction box & circuit extension
Live Turnkey Estimate
$2,800 – $3,900
Flexible Financing: ~$74/mo (OAC)
Calculated Scope Breakdown:
200A Modern Service Panel$2,800 – $3,900
Every Kilowire Quote Includes:
  • City & Utility Permit Processing (SCE / LADWP)
  • Dual 8-Foot Copper Grounding Rods & Water Bond
  • Whole-Home Type 2 Surge Protector (SPD)
  • 10-Year Workmanship Warranty & Inspection Passing Guarantee
Contractor Transparency

Why C-10 Electrical Contractors Require These 3 Photos

In California, electrical panels cannot be quoted blindly over the phone. National Electrical Code (NEC) and local utility standards (SCE Underground & Overhead ESR manual, LADWP Electric Service Requirements) enforce strict legal clearances:

1

Main Breaker & Bus Rating (Photo 1)

We identify dangerous recalled panel brands (Zinsco, Federal Pacific Electric / Stab-Lok, Challenger) and verify existing service capacity (60A, 100A, or 125A).

2

Gas Meter Clearance & Working Space (Photo 2)

NEC 110.26 requires a dedicated 30" wide × 36" deep clear workspace in front of the panel. Southern California Gas and utilities mandate a minimum 3-foot horizontal clearance from gas meters.

3

Overhead Weatherhead & Roof Clearance (Photo 3)

Verifies utility drop height above driveway or walkway, mast roof penetration, and proximity to trees or structures before utility engineering approval.

Need an Emergency Inspection?

If your panel is buzzing, smelling hot, or actively sparking, call our emergency dispatch team immediately.

Direct Dispatch Hotline (626) 600-0818 Available Monday–Saturday across all LA County

Key Panel Warning Signs:

  • Main breaker feels warm or hot to the touch
  • Flickering lights when AC or microwave turns on
  • Visible rust or corrosion inside the panel enclosure
  • Federal Pacific (FPE) or Zinsco / Sylvania breaker branding
Frequently Asked Questions

Common Questions About Upgrading Your Electrical Panel in LA

How much does a 200 Amp panel upgrade cost in Los Angeles?

A turnkey 200A residential panel upgrade in Los Angeles County typically ranges between $2,800 and $4,500. This includes all city permits, utility coordination with SCE or LADWP, dual 8-foot copper grounding rods, water pipe bonding, whole-home surge protector, and passed inspection guarantee. Relocating a panel or running underground conduit may add $600 to $2,500 depending on trenching distances.

How long will my electricity be shut off during installation?

Electricity is typically shut off for 4 to 6 hours on installation day. We schedule early morning utility disconnects, install the new load center and bonding conductors, pass the city inspector's rough inspection, and have SCE/LADWP restore power the same afternoon.

Why do insurance companies require replacing Zinsco or Federal Pacific panels?

Zinsco and Federal Pacific Electric (FPE) panels have catastrophic failure rates documented by the Consumer Product Safety Commission (CPSC). Their circuit breakers fail to trip during overloads, causing conductors to weld and spark inside walls. Major California homeowners insurance carriers (including State Farm, Travelers, Farmers, and Orion180) routinely deny coverage or cancel policies until these panels are upgraded.

Do you offer financing for electrical panel upgrades?

Yes! We offer flexible financing programs with monthly payments starting from just $79/month upon credit approval. You can upgrade your electrical service now to protect your home and charge your EV without large out-of-pocket costs.